Construction supervision of Zaniyeh water pipe lines and a pumping station in al Mafraq city including the valves, fittings and pipes in accordance to the contract specifications.
The project consists of:
- Construction of ductile pipelines with (100 – 150 – 200 - 300 mm) diameters, (1300 - 1350 - 2650 - 4400 m) length and 25 bar pressure
- Construction of the pumping station’s building with an area of 120 m2
- Construction of a fence around the pumping station with a length of 160 m
- Paving of the pumping station’s yard of 1200 m2.
- Construction of a septic tank (3*3*3 m3)
- Supplying, installing, operating and maintaining of an electrical crane of 5 tons.
Soil testing of the water tank site.