Project works included the following components:
- Primary and secondary sewer networks of (200- 300 mm) diameters and a total length of 81 km in different areas, as follows:
- Irbid 26 km
- Mafraq 14.75 km
- Ramtha 11.55 km
- Ajloun 6.8 km
- Jerash 3.9 km
- Zarqa 17.6 km
- Household connections with 150 mm diameter with a length of 13.5 km
- Ductile boost line with a length of 2.4 km and a diameter of 150 mm
Lifting station in Mafraq city with a capacity of 750 m
3 /day