The scope of work for this project comprised of construction supervision of a 20 km single-carriage road connecting the Amman – Aqaba desert highway, starting at Swaqa (00+0) and running east until the start of the hazardous waste landfill road (920+19). The road has an upper surface width of 10.2 m, a slope of 2%, two 3.3 m lanes, and a 1.8 m hard shoulder at each side. Works included performing earthworks (excavation and backfilling in accordance with road design profiles and natural earth contours/elevation), layer selection, sub-layer works (including base and sub base coursing, selected layers, and sub grades), hot-mix asphalt works, laying reinforced concrete to protect the culvert entrances and exits, placing reinforced box and 750 mm, 900 mm, and 1,200 mm diameter pipe culverts, laying riprap to protect the side of the road tendencies and culvert entrances and exits, placing warning signals, painting lanes’ lines, and installation of road barriers.