Construction of 2.67 km of a new road connecting Souf and Ain Janna. Work included earth works (excavation and backfilling in accordance with road-design profiles and natural earth contours and elevation), layer selection, performing sub-layer works, including laying base and sub base courses, selected layers, and sub grads), performing piling works, reinforced concrete bridges, nodes of the lanes and the main corridor, paving, piping for drinking water and irrigation with different diameters, electrical works, box culverts,..etc.:
- The earthworks required for the completion of the work, including digging, filling, and borrowing, digging trenches, preparing the earth base, re-filling, drainage and humidification, according to the technical specifications of the project, including replacement of the "invalid" materials to be established under the Toppping layer.
- Implementation of rainwater installations including ferries and tubular ferries with their entrances and exits, earth trenches, trenches and protection with normal and drowning hail.
- Implementation of the stone and concrete walls in the necessary areas, which increase the height of the mantle to 5 m on the original acquisition limits.
- To create paving layers consisting of the layer of the selected materials (Topping), the layers of sediments and the layers of the asphalt bonding and surface.
- Sporadic works such as warning signs, guidance, road surface paint, cat's eyes, metal barriers, retaining walls, and ordinary and submerged riprap.
- Provide all information regarding work obstacles which retard the implementation process of the work flow and taking the needed procedures to remove these obstacles in coordination with the relevant parties.
Perform any subsequent additional work resulting from the intersection of the sub-streets with the main road and the extension of the tubular ferries for the necessary infrastructure services along the length of the project as indicated in the design schemes.