Construction supervision for the Husban Kafrein Irrigation scheme rehabilitation, comprising the following stages:
- Replacement of the 7 km, 250 mm diameter pipes with 500 mm diameter pipes, and connecting them to the 450 mm diameter discharge line.
- Rehabilitation of HDPE pipes network of 150 - 250 mm diameters, and ductile pipes of 400 - 500 mm diameter.
Rehabilitation of the irrigation connections at the agricultural roads in Husban and construction of new connections and transfer lines.