MOSTAQBAL UNITED MOSTAQBAL UNITED MOSTAQBAL UNITEDMOSTAQBAL UNITED
  • HOME
  • About
  • Specialties
  • Projects
    • Healthcare Facilities
    • Educational Facilities
    • Hospitality & Mixed Use
    • Private & Public Facilites
    • Industrial Cities & Facilities
    • Water & Waste Water
    • Transportation and Roads
    • Environmental Studies
    • Energy & Power
  • News
  • Careers
  • Contact
Jerash Ajloun Road
Jerash Ajloun Road
  • Services Construction supervision
  • Value of Construction 1, 201, 125 JD
  • Client Ministry of Public Works and Housing
  • Location Jerash, Ajloun (Sakeb – Remon)

The project starts from the station (800 + 1) km and passes through the town of Remon and Sakeb heading up to Ajloun to the station (380 + 9) km with a length of 7.5 km and includes the work to re-establish the road in level of secondary roads with 2 lanes and a width of 3.6 m per lane and an outer shoulder width of 2 m so that the upper width for the 2 lanes with shoulders becomes 11.2 m. Works included excavations, tiling, foundation layer, pre-foundation layer, asphalt, tubing drainage and retaining walls.

Prev Next
® Mostaqbal United Engineering and Environmental Consultants 2025