MOSTAQBAL UNITED MOSTAQBAL UNITED MOSTAQBAL UNITEDMOSTAQBAL UNITED
  • HOME
  • About
  • Specialties
  • Projects
    • Healthcare Facilities
    • Educational Facilities
    • Hospitality & Mixed Use
    • Private & Public Facilites
    • Industrial Cities & Facilities
    • Water & Waste Water
    • Transportation and Roads
    • Environmental Studies
    • Energy & Power
  • News
  • Careers
  • Contact
Irbid Refugee & Storm water drainage System
Irbid Refugee & Storm water drainage System
  • Services Construction supervision
  • Value of Construction: 924, 000 JD
  • Client Housing and Urban Development Corporation
  • Location Irbid

The project comprised of two main components.

  1. Irbid refugee camp’s infrastructure which included
  • Roads construction of 10,700 m2
  • Paving existing roads of 4,750 m2
  • Concrete corridors of 23,000 m2
  • Sidewalks of 8,100 m2
  • Storm water drainage network of 470 m2
  • Maintenance and development of electrical and lighting networks.
  1. Storm water drainage system outside the camp’s boundaries, including:
  • Storm water drainage network of 2,300 m length and 1,200 mm diameter pipes, 46 manholes
  • Box culverts of 550 m length
Reconstruction of roads and pavement of 5200 m2

Prev Next
® Mostaqbal United Engineering and Environmental Consultants 2025