Construction supervision of part of the Hasa / Tafileh road starting from the station (400 + 15) to the station (26 + 800) with a length of 11 km, and consists of 2 lanes with a width of 7.2 m, in addition to the road shoulders with a width of 3 m from each side, as well as the extension to the existing bridge from station (0 + 000) to station (525 + 4). The project also consisted of the supervision of the road which leads to the special needs center in Al Ees city with a length of 2.5 km and 7.2 m width including storm water drainage and paving layers. Works also included the preparation of studies, designs, tender documents, and soil tests for the road connecting the Al-Hasa Cement Factory with the Hasa Al-Tafileh Desert road, which is a two-lane road with a length of 5. 26 km.