MOSTAQBAL UNITED MOSTAQBAL UNITED MOSTAQBAL UNITEDMOSTAQBAL UNITED
  • HOME
  • About
  • Specialties
  • Projects
    • Healthcare Facilities
    • Educational Facilities
    • Hospitality & Mixed Use
    • Private & Public Facilites
    • Industrial Cities & Facilities
    • Water & Waste Water
    • Transportation and Roads
    • Environmental Studies
    • Energy & Power
  • News
  • Careers
  • Contact
Grid Integration of Nuclear Power Plant (NPP) with the Jordanian Electric Transmission Network
Grid Integration of Nuclear Power Plant (NPP) with the Jordanian Electric Transmission Network
  • Location Amra, Amman – Jordan
  • Client Jordan Atomic Energy Commission (JAEC) through Tractebel Engineering (Lead International Consultant)
  • Services Environmental Impact Assessment Study

The project aims at aims at meeting the forecasted electricity demand and securing the electricity supply stability, through the provision of three overhead transmission lines (OTL) each of 400 kV potential, to transmit the power produced by the NPP from Amra to different areas (Namely; Al-Hassan, Al-Madounah,  and Zmaileh – located at 94km, 48km and 54km from Amra respectively). The project also included two newly proposed substations.

Prev Next
® Mostaqbal United Engineering and Environmental Consultants 2025