Project Description: The objective of the project is to replace the existing bridge with a new one, while also maintaining the old bridge during the construction process. The project aimed to construct a new bridge that is 60 meters in length and 20 meters in width, and to connect it with the existing road using approximately 380 meters of asphalt road. The project included the construction of various infrastructure elements such as box culverts, retaining walls on the side of the road, and reconstruction of roads, sidewalks, median islands, and stormwater drainage systems. The construction of these elements was crucial to ensure smooth traffic flow and safety for road users. To ensure public safety, the project included the installation of traffic signs and road painting. These safety elements were essential to provide clear guidance to road users and ensure the smooth flow of traffic during the construction process. The project also involved the transportation and securing of public utilities, including earthworks such as backfilling and excavations, and the installation of layers of paving and asphalt. The project aimed to minimize disruption to the surrounding community during the construction process while ensuring that all utilities were safely relocated. The construction of the new concrete bridge and associated infrastructure was a challenging project that required careful planning and execution. However, with the help of skilled engineers and construction professionals, the project was completed successfully, and the new infrastructure was delivered on time and within budget. The new bridge and associated infrastructure will provide a safe and reliable transport solution for many years to come, benefiting the local community and supporting economic growth in the region.