Upgrading and expansion of the wastewater treatment plants in Baqa’a from 6000 m3 to 14000 m3 and Abu Nusair from 4000 m3 6000 m3 in compliance with the contract specifications.
- The Baqa’a wastewater treatment plant’s works consists of:
- New oil and grease removal unit
- Modifications of the existing primary clarifier
- Modifications to the existing bio filter pumping station
- Modifications to the existing bio filter
- New solids contact basin
- New secondary clarifier
- New sludge thickener
- New sludge pumping station
- Odour control facilities
- Miscellaneous concrete structure
- Demolition of existing facilities
- Site grading, road, piping and electrical work
- Emergency generator
- The Abu Nusair wastewater treatment plant’s works consists of:
- Modifications to the existing clarifier
- New secondary clarifiers
- Odour control facilities
- New mixer in the existing aeration basins.
- Modifications of the existing chlorine contact basin.
- Miscellaneous concrete structure.
- Electrical works
Surface restoration of site grading and roads