Improving the infrastructure of Wehdat, Hussein and Hittin camps, including new infrastructure networks and the rehabilitation and replacement of the damaged networks, works included:
- Maintenance of asphalt roads of approximately 15 km length
- Re-construction of the asphalt roads of 3.5 km
- Re-construction of concrete corridors 28, 050 m2
- Maintenance of the concrete corridors 115, 050 m2
- Create concrete pavements with a total length of 20, 700 m
- Water network made of ductile and polyethylene with different diameters and house connections, of 112.5 km total length
- Improving the electricity network
- Storm water drainage network of 14 km
- Sewerage network of 4 km length
- Water tank capacity of 4, 000 m3
- Pumping station and upper storage tank 100 m3
- Two bridges
Lifting station