Al-Karak Industrial Estate at a distance of 19 km to the east of Al Karak City on a land of 1850 donum area. Works included:
- Site works and Retaining walls works of 3,800 m length
- Administration and services buildings of 3,545 m2 built up area
- Infrastructure works as follows:
- Roads works of 6.5 km length
- Water network of 6.5 km length
- Sewerage network 5.5 km length
- Electrical networks (medium & low voltage) and street lighting works
- Firefighting and Telecommunication networks
- Elevated water tank with 350 m3 capacity
- Underground water tank with 1,200 m3 capacity
Wastewater treatment plant with 2,500 m
3/day capacity