Infrastructure works of the Abdali Development Project with a total plot area of 350,000 m2. Works included:
- Water networks of approximately 6.2 km length
- Storm Water Networks
- Roads Works, Yards and Sidewalks
- Drainage Networks of approximately 5.9 km length
- Fire Fighting Systems
- Electrical and Mechanical Systems
- Telecommunication Networks
- Street Lighting
Elevated and Underground Water Tanks