The project involves eight sorting and compost stations across six Jordanian municipalities, aimed at reducing waste going to landfills and promoting sustainable waste management practices. Composting and sorting plants can be at risk of fire due to the nature of the waste materials and equipment used. To mitigate this risk, appropriate fire safety measures, such as fire suppression systems and regular maintenance of equipment, should be in place. The project aims to design and install safety systems for these facilities, utilizing modern technology to meet the project's functions and control requirements.
Provided Services:
MOSTAQBAL rendered full designs and documentation along with granting civil defense approvals including detailed drawings, Bill of Quantities and all needed specifications and cost estimation besides providing engineering inspection/Supervision during the construction/installation phase.
• Design MEP Fire Alarm & Fire-fighting Systems
• Provide As-Built Drawings
• Obtain Civil Defence Approvals
• Construction supervision
Client Name:
GIZ
Project Location:
Irbid \ Karak \ Dair Alla \ Madaba \ Mafraq , JORDAN
Project Date:
2020