Intersections and bridges of Wadi Al Yutum channel - Phase II, works included:
- Construction of the concrete bridge 52 m long and 25 m wide at the Wadi Al Yutum channel intersection with the Aqaba-Aghwar road (Wadi Araba road) near the customs centre.
- Excavations of Wadi Al Yutum channel of 33,000 m3 and excavations in the bridge’s area of 10,850 m3
- Protection works of the canal floor protection and the Gabion walls.
- Asphalt mixtures of the bridge and the detour area.
Transporting services passing by the bridge site.