The project comprised of miscellaneous wastewater network in Balqa Governorate (Salt- Ain AlBasha – Safoot - AlFhais - Um AlDananeer). Works included:
- Construction of concrete and ductile iron sewer networks with a total length of 77 km:
- Diameter 150 mm, with length of 5.18 km
- Diameter 200 mm, with length of 69.65 km
- Diameter 300 mm, with length of 1.55 km
- Diameter 400 mm, with length of 1.0 km
- Excavation and backfilling
- Encasement of the pipelines with concrete of 828.5 m3
Execution of 1, 240 house connections (150 mm) diameter.