Construction of Khaw intersection which included 2 service roads each of 4.5 km length dedicated for oil-transporting trucks use.
The project works included:
- Cleaning and layering the earth
- Earth works including excavations, drilling, backfilling and preparing the base coarse including the sideway inclinations
- Prepare the paving material which consists of the soil layers and the double layered final pavement in addition to the asphalt mixture and prepare the shoulders
- Drainage facilities and culverts
- Side and middle islands as well as the Curbstone
Installation of raised pavement markers, ripraps and traffic lights and signs