MOSTAQBAL UNITED MOSTAQBAL UNITED MOSTAQBAL UNITEDMOSTAQBAL UNITED
  • HOME
  • About
  • Specialties
  • Projects
    • Healthcare Facilities
    • Educational Facilities
    • Hospitality & Mixed Use
    • Private & Public Facilites
    • Industrial Cities & Facilities
    • Water & Waste Water
    • Transportation and Roads
    • Environmental Studies
    • Energy & Power
  • News
  • Careers
  • Contact
KADDB Industrial Complex in Khaldeyyah
  • Services • Design, tender documents preparation of all project\s elements • Construction Supervision
  • Value of Construction: JOD 15,000, 000
  • Client King Abdullah II Design and Development Bureau (KADDB)
  • Location Mafraq

The project is located at Al-Khalideye/ Mafraq Governorate on land plot no. 565 basin (6) with 93 donum plot area. The project components included:

  1. Buildings works of 25,000 m2 built up area as follows:
  • Re-designing the existing administration building of 2,000 m2 built up area,
  • Rehabilitation and development of the technological centre hanger of 10,000 m2 built up area, and adding a mezzanine floor of 2,560 m2
  • Developing new MEP, AV and acoustics systems for existing buildings of 18,500 m2 built up area
  • New guest house, multi-purpose hall, central kitchen and services and logistics offices buildings of 4,740 m2 built up area
  • New warehouse hanger of 3,750 m2
  1. Landscape works
  2. External works including car parking, external walls, and control/monitoring towers
  3. Infrastructure works as follows:
  • Water network of 1.2 km length
  • Wastewater network of 1 km length
  • Storm water drainage network of 1.25 km length
  • Firefighting network of 1.25 km
  • Roads of approximately 2 km length
  • Electrical, street lighting and security networks
Lifting station of 20 m3/hour capacity

Prev Next
® Mostaqbal United Engineering and Environmental Consultants 2025