The project starts from the station (800 + 1) km and passes through the town of Remon and Sakeb heading up to Ajloun to the station (380 + 9) km with a length of 7.5 km and includes the work to re-establish the road in level of secondary roads with 2 lanes and a width of 3.6 m per lane and an outer shoulder width of 2 m so that the upper width for the 2 lanes with shoulders becomes 11.2 m. Works included excavations, tiling, foundation layer, pre-foundation layer, asphalt, tubing drainage and retaining walls.