The project included two packages executed in parallel, as follows:
- Package I: four secondary schools at Al-Kourah and Bani Kenanah - Irbid with a total built up area of 12,265 m2
- Package II: three secondary schools at Balqa Governorate with a total built up area of 9,580 m2
Works also included all the external works of yards and roads, retaining walls, water tanks, septic tanks, and all electrical and mechanical services.