Rehabilitation of the existing jetty head and jetty platform, installation of new loading arms and booster pump stations and pipelines. In addition, the project consisted of upgrading the oil jetty and berth facilities to allow safe berthing and de-berthing operations for different tanker sizes (up to 350,000 dwt) unloading/loading of crude oil, refined product and LPG and miscellaneous chemical liquids. The associated transfer pumps and pipelines are inspected and upgraded to enable the terminal to handle approximately 14 million tons of crude oil and its products annually and miscellaneous chemical liquids.