Farouk street and its tributaries of 5 km length starting from the intersection of Queen Rania Abdulla street down to the roundabout which intersects with king Hussein Bin Talal street. The scope of work included:
- Examine and propose solutions for the poor storm water drainage
- Rehabilitate the storm water drainage network to tackle the flood issues and propose solutions
- Study the street’s elevation and compare it with the existing drainage network at Al-Farouk Street
Propose several solutions and designs for the issue which include the feasibility studies and cost of each solution and design