MOSTAQBAL UNITED MOSTAQBAL UNITED MOSTAQBAL UNITEDMOSTAQBAL UNITED
  • HOME
  • About
  • Specialties
  • Projects
    • Healthcare Facilities
    • Educational Facilities
    • Hospitality & Mixed Use
    • Private & Public Facilites
    • Industrial Cities & Facilities
    • Water & Waste Water
    • Transportation and Roads
    • Environmental Studies
    • Energy & Power
  • News
  • Careers
  • Contact
Cabling Route for the Ma’an Solar Park
Cabling Route for the Ma’an Solar Park
  • Services Carry out detailed design for the cables rout (trenches) including: - Collect all necessary details for connecting the out coming cables at the Investor’s substation and the incoming cables at NEPCO main station - Preparation of road profiles for the cable path from Investor’s substation to NEPCO main substation - Preparation of necessary cross section details for cables at different locations to make work more clear for construction - Preparation of full details in cooperation with NEPCO showing how the cables of each investor interfere with others in the main trench just before entering NEPCO main substation - Preparation of full details in cooperation with NEPCO showing how the cables of each investor are connected to NEPCO main substation - Carry out necessary field surveys - Prepare full tender documents - Support in tendering process and tenders evaluation
  • Client Ma’an Development Area (MDA)
  • Location Ma’an

Cables routing for the Ma’an solar park, starting from the investors’ substation to the main substation (NEPCO’s) along with relevant authorities follow up and approvals.

Prev Next
® Mostaqbal United Engineering and Environmental Consultants 2025