Aqaba Industrial Estate, located 10 km from Aqaba city, 700 m east to A;-Hussein Bin Talal airport on a plot of 1,200 donum within the Aqaba Special Economic Zone (ASEZ). Works included site planning, external and infrastructure components as follows:
- Internal roads network with a total length of 7 km,
- Water and Wastewater networks
- Strom water drainage network
- Firefighting network
- Streets lighting network
- V electrical distribution network and street lighting
- Telecommunication network
External fence, main gate and retaining walls.