Expansion of Al Molooky 8 km long road in Tafileh which connects Prince Zaid Hospital and Ain AlBaida.
The works include:
- The expansion of the two lanes road for the first 5 km.
- Re-constructing of 3 km four lane-road separated with an island.
The works included: earth works including excavation and backfilling in compliance to the road’s design profile and natural ground elevations, asphalt works, sidewalks, street lighting, barriers, box culverts, pipe culverts, white and yellow painting works and traffic signs.