MOSTAQBAL UNITED MOSTAQBAL UNITED MOSTAQBAL UNITEDMOSTAQBAL UNITED
  • HOME
  • About
  • Specialties
  • Projects
    • Healthcare Facilities
    • Educational Facilities
    • Hospitality & Mixed Use
    • Private & Public Facilites
    • Industrial Cities & Facilities
    • Water & Waste Water
    • Transportation and Roads
    • Environmental Studies
    • Energy & Power
  • News
  • Careers
  • Contact
Airfield Expansion Project at Al-Ghabawi
  • Location Al Ghabawi, Zarqa
  • Client Al-Taff Contracting Establishment
  • Value of Construction 12, 000,000 JOD
  • Service Preparation of studies, design, and tender documents

Project works included the following:

  • Construction of three pre-engineered steel hangers with a total built up area of 15,000m2. The main hanger door (single, large, operating, tracked, telescoping door) with height of 15.24 m with a motorized door opener.
  • An administrative offices building hanger with a total built-up area of 4,177 m2 and 9.14 m height.
  • Concrete apron (153 m width and 285 m length and 0.3 m thick and a total area of 43,320m2) with airfield lighting and tie downs for aircrafts in front of each hanger.
  • New aircraft taxiway constructed of asphalt (29 m width and 640 m length) capable of handling 265.590 Ton in the gross weight. The taxiway connects the new apron to the existing runway.
  • Two over ground water steel tanks with the capacity of 1,000 m3
  • Underground wastewater tank with capacity of 670 m3.
  • Pumps room with a total built-up area of 103 m2.
  • Parking lot with a total area of 3,240 m2.
  • Internal roads network that connects the hangers, the road that connects the hangers to the external site of 640 m length.
  • A fenced area that contains two electrical generators and two transformers.
  • Covered vehicle parking that accommodates 20 vehicles.
Steel fence surrounding the area with a main gate operated electrically.

Prev Next
® Mostaqbal United Engineering and Environmental Consultants 2025